
Form I-CAUA, P/N 164771 R8, Page 43
INDEX
A
Accessories 4
B
Belt Drive 30
Belt Tension 29
Adjusting Blower Speed 29,
30
Bottom Filter Cabinet 26
Brackets for Attaching the
Concentric Adapter Box
15
Burner Condensate Drain 33
C
California Warning Label 3
Check Installation & Startup
40
Clearance 6, 11
Clearances to Horizontal Vent
Terminal 14
Cased Cooling Coil 31
Combustion Air Inlet Collar 9
Combustion Air Pipe 9
Combustion Air Proving
Switch 38
Concentric Adapter Box 12
Concentric Adapter Box
Connections 13
Concentric Pipes 10
Condensate Drain Trap 33
Condensation 10, 22
Control Locations 38
Cooling Capacity 31
Cooling Coil Technical Data
31
D
Dimensions 5
Direct Drive Motor 30
Discharge Duct Connection
27, 28
Double-Wall (Type B) Pipe 11
Drain Line 32
Drive 29
Ductstat with Capillary Tubing
29
E
Equalizer Tubing 32
F
Dirty Filter Switch 39
Filter Cabinet, Option CW 25
Filters for Options CW8,
CW9, CW10 25
Flue Wrapper Condensate
Drain 34
G
Gas Connection 7
Gas Piping and Pressures 6
General 2
H
Hazard Labels 2
high altitude combustion air
proving switch 38
Horizontal, Option CC6,
instructions 13
Horizontal Air Inlet 25
Horizontal Vent Terminal 23
I
Ignition System 39
Inlet Air 24
Inlet Air Ductwork 24
Inlet Air Opening 24
inlet air opening 6
Installation Codes 3
Installation Instructions for
Horizontal Vent Kit, Option
CC6 14
Installation Instructions for
Vertical Vent/Combustion
Air Kit Option CC2 17, 18
J
Joints and Sealing 10
L
Heater Location 3, 4
M
makeup air option 34
Manifold gas pressure 8
Massachusetts Requirements
3
Blower Motor 29
Motor Amps 34, 35
O
Option CC2, Vertical Vent
Terminal/Combustion Air
Package 17
Option CC6, Horizontal Vent
Terminal/Combustion Air
Package 14
Option CW10 for Field-
Supplied Filters 25
Option CW8 with 2" Pleated
Filters 25
Option CW9 with 2"
Permanent Filters 25
P
Pipe Diameter and Length 10
Positioning 6
Power-Vented 9
Power Vent 20
Preparing for Installation 4
Pressure Switch Settings 38
R
Receiving 4
REFERENCES 43
Refrigerant Type 31
S
Separated-Combustion 9
Separated Combustion
Installation 9
Startup 40, 42
T
Thermal Expansion Valve
Bulb 32
Thermal Expansion Valves
31
Thermostat 35
Thermostatic Expansion
Valve(s) 31
Thermostatic Expansion
Valve Equalizer Line 32
thermostatic expansion valves
40
V
Gas Valve 7
Variable Frequency Drive 30
Venter Outlet 9
Venting and Combustion
Air 8
Venting System 9
Vent Pipe 9
VERTICAL Vent Instructions
17
Vertical Vent Terminal/
Combustion Air Inlet
(Option CC2) 19
Vertical Vent Terminals 24
Vibration Isolation Pads 6
W
Warranty 3
Heater Weights 3
Wiring Diagram 36, 37
REFERENCES
Description ............................................................................................Form
Model CAUA Operation/Service/Maintenance Manual ...................O-CAUA
Model ACU or Option C Cased Cooling Coil Installation .......... I-CAUA-CC
Optional Discharge Plenum Installation Instructions .............. I-CAUA-DP
Optional Filter Cabinet Installation Instructions ....................... I-CAUA-FC
Optional Inlet Air Mounting Base Installation Instructions .......I-CAUA-IB
Optional Mixing Box Installation Instructions .........................I-CAUA-MB
Gas Conversion Instructions ................................................CP-CAUA-GC
Ignition Control Replacement Kit Instructions ...................CP-CAUA-IGN
Replacement Parts .......................................................................... P-CAUA
Kommentare zu diesen Handbüchern