Reznor R6GP Option - Installation - Bottom Power Entry Bedienungsanleitung Seite 4

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 8
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 3
4
7. On the left side of the unit control panel, behind
the low-voltage connection box, remove the 1”
diameter Heyco bushing from the base of the control
panel and install the remaining ¾” diameter FMC
connector.
8. Install the two insulator sleeves in the ends of the
¾” diameter fl exible metal conduit and then install
the conduit fully into the connectors and secure it
in place.
9. Install the 7/8” diameter star bushing into the bottom
hole on the bottom power entry box and one of the
1-1/4” diameter FMC connectors in the remaining
(top,front) hole of the bottom power entry box.
Figure 4.
Figure 6.
Figure 5.
10. On the base of the Blower compartment / Condenser
section external divider panel, remove the plastic
button plug and open up the slit in the insulation.
Figure 7.
11. Install the remaining 1-1/4” diameter FMC
connector.
12. Insert the two 1-1/4” insulator sleeves into the ends
of the 1-1/4” exible metal conduit and install the
conduit into the two connectors. Secure the conduit
in place.
Seitenansicht 3
1 2 3 4 5 6 7 8

Kommentare zu diesen Handbüchern

Keine Kommentare