Reznor R6GP Option - Installation - Bottom Power Entry Bedienungsanleitung Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 8
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
¢708978k¤
7089780
7089780
Specifi cations and illustrations subject to change without notice and
without incurring obligations. Printed in U.S.A. (03/09)
Figure 18. Wire Routing Diagram
Wire Routing Instructions
Low Voltage Wiring
Bring thermostat wiring into Compartment B .
Route out at hole 7 to low voltage access hole
8 .
Make appropriate connections at location 9 .
High Voltage Wiring
Bring Branch Circuit wiring into Compartment A
Route through FMC 1 through conduit 2 to
disconnect 3 .
After disconnect, route wiring back through
conduit 2 to compartment A .
Then route wires through FMC 4 to the unit
control panel access 5 and make ground and
power connections at location 6 .
ANCHOR CONDUIT SECURELY TO BASERAIL
Seitenansicht 7
1 2 3 4 5 6 7 8

Kommentare zu diesen Handbüchern

Keine Kommentare